Projects · Sharjah
BEEAH / Chinook waste-to-hydrogen
Joint development agreement signed; no FID. The operating unit is a demonstration plant in Nottingham, UK, not in the UAE.
Last verified:
AnnouncedAs of 4 December 2023Confidence: High
- Location
- Sharjah
- Sponsors
- BEEAH Group · Chinook Hydrogen · Air Water Gas Solutions
- Capacity
- Initial 7 tonnes per day, goal of 20 tonnes per day
- Technology
- RODECS pyrolysis with Active-Hydropyrolysis (waste-to-hydrogen, not electrolysis)
- Offtake
- Not disclosed
What the sources establish
Joint development agreement signed; no FID. The operating unit is a demonstration plant in Nottingham, UK, not in the UAE.
Sources
Source: BEEAH Group · beeahgroup.com · 4 December 2023 · Retrieved 26 August 2026