Projects · Bruck an der Leitha, Austria

OMV / Masdar green hydrogen plant

Construction began in September 2025 and the plant is expected to be operational in 2027.

Last verified:

Under constructionAs of 6 November 2025Confidence: High
Location
Bruck an der Leitha, Austria
Sponsors
OMV · Masdar (49%)
Capacity
140 MW electrolyser
Technology
Electrolysis
Offtake
Not disclosed

What the sources establish

Construction began in September 2025 and the plant is expected to be operational in 2027.

Sources

Source: Masdar · masdar.ae · 6 November 2025 · Retrieved 26 August 2026