Projects · Ruwais industrial complex, Abu Dhabi
Project Crystal (Ruwais electrolyser)
Never reached FID. Target FID of Q4 2023 slipped and was still pending in February 2024. The project does not appear anywhere in Fertiglobe's 2025 Annual Report growth pipeline, despite Fertiglobe being the designated sole long-term hydrogen offtaker.
Last verified:
- Location
- Ruwais industrial complex, Abu Dhabi
- Sponsors
- Masdar · ENGIE · Fertiglobe
- Capacity
- Announced at up to 200 MW in 2022; retendered at 100 MW in 2023
- Technology
- Grid-powered electrolysis
- Offtake
- Not disclosed
What the sources establish
Never reached FID. Target FID of Q4 2023 slipped and was still pending in February 2024. The project does not appear anywhere in Fertiglobe's 2025 Annual Report growth pipeline, despite Fertiglobe being the designated sole long-term hydrogen offtaker.
Sources
Source: Fertiglobe / MEED · fertiglobe.com · March 2026 · Retrieved 26 August 2026