TAQA / AD Ports green hydrogen to ammonia

Announced in July 2021 as a plan. No FID, EPC award or construction start has been found in any source. The '2 GW' figure is a solar rating, not electrolysis capacity.

Last verified:

AnnouncedAs of 11 February 2025Confidence: Medium
Location
KEZAD, with pipeline to Khalifa Port
Sponsors
TAQA Group · AD Ports Group
Capacity
2 GW solar PV to power electrolysers. The electrolyser rating was never disclosed.
Technology
Solar-powered electrolysis to ammonia
Offtake
Not disclosed

What the sources establish

Announced in July 2021 as a plan. No FID, EPC award or construction start has been found in any source. The '2 GW' figure is a solar rating, not electrolysis capacity.

Sources

Source: TAQA (via Renewables Now) · renewablesnow.com · 11 February 2025 · Retrieved 26 August 2026